Compare like with like
Check whether a figure is labour only, supply and installation, per unit, per square metre or an annual AMC. Parts and materials can change the total.
Clear “from AED” starting points across every service. Final pricing is confirmed after we review your photos, measurements, and access needs.
Figures are indicative 2026 Dubai market planning bands and may vary with scope, size, access, materials, parts and approvals. Your exact price is confirmed in a written quote.
How to use this page
These ranges help you compare the right service and prepare useful information for an accurate quote. They are not a substitute for an inspection where the fault, quantity or access conditions are unknown.
Check whether a figure is labour only, supply and installation, per unit, per square metre or an annual AMC. Parts and materials can change the total.
Tower access, parking, working hours, height, false-ceiling access, long routes and reinstatement can affect the scope. Building or authority approvals may be separate.
Share your community, property type, service or fault, photos or video, measurements or unit count, urgency and any material preference on WhatsApp.
Planning bands only. Final pricing depends on system type, tonnage, access, fault, refrigerant, equipment, parts and whether the work is a visit, repair, deep clean or installation.
Dubai market guide bands only; final pricing depends on task type, materials, wall or item complexity, access, quantity, working height, disposal and whether a specialist trade is needed.
Planning bands only — final price depends on urgency, access, diagnosis, parts, equipment, wall opening and reinstatement.
Directional market benchmarks — final scope and price depend on the property condition, access, materials, and preparation required.
Planning bands only. Final pricing depends on property size, furnishing, condition, team size, add-ons, tank capacity, access, timing and documentation requirements.
Market benchmarks only — final pricing depends on assets, visits, response terms, parts, access, and the agreed exclusions.
Planning bands only; final pricing depends on property size, AC count, systems, access, parts, outdoor equipment, response terms and whether the work is a one-off repair or AMC.
Planning bands only; final pricing depends on measurements, board or timber specification, finish, hardware, design, access, delivery, installation and approvals.
Dubai planning bands only — final price depends on ceiling type, board grade, design, area, drop height, lighting or AC openings, access, paint, approvals, and reinstatement.
Planning bands only. Labour-only and supply-and-install figures are separated because tile, subfloor, removal, waterproofing, access and finish level can change the final quote substantially.
Dubai market guide bands only — area, preparation, material, access, repair depth, moisture and finish level affect the final quote.
Dubai market guide bands only. Final pricing depends on system type, capacity, drawings, material specification, access, testing, civil work and authority or building requirements.
Renovation is quoted per project after a site review. These Dubai market bands help with early planning; design, demolition, MEP, finishes, access, approvals and reinstatement can move the final scope materially.
Planning bands only; final pricing depends on apartment or villa size, trade, diagnosis, parts, access, urgency, testing and whether the request is one-off or under an AMC.
In-depth answers on what services really cost in Dubai — and what drives the price.
No. They are indicative 2026 Dubai planning bands, not a fixed tariff. The final quote depends on the diagnosed issue, quantities, materials or parts, access, working height, timing and any building or authority requirements.
Ask for the service scope, quantity or units, labour, materials or parts, access or approval items, exclusions, warranty where applicable, VAT treatment and the total amount. SKN confirms the exact scope and price before work starts.
The work may need building access coordination, parking or loading arrangements, permits, restricted working hours, longer pipe or cable routes, height access, reinstatement or a larger quantity. Send the community, property type and photos so these factors can be priced correctly.
Labour-led quotes hold for the period stated on the document. Material-heavy quotes — copper pipework, cable, breakers and switchgear, or imported HVAC parts — are normally issued with a shorter validity of about 7 to 14 days, because supplier pricing on those items moves. Labour and materials are listed separately so you can see which part is exposed, and a deposit may be required before expensive equipment is ordered.